NSW deep dive › Project › Victoria to NSW Interconnector West
Victoria to NSW Interconnector West
Transgrid (NSW component) · developer: Transmission Company Victoria (TCV — VIC component)
transmissionEIS preparationConfidence: Very high
Capacity and technology
Technology
transmission
Capacity (MW)
unknown
Voltage
500 kV
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
EIS preparation
Planning status
EIS lodged on NSW Planning Portal. Submissions Report + Amendment Report due mid-2026.
Access right status
not applicable
EPBC status
verify on EPBC public portal
Grid connection
~235 km in NSW between Kerang Substation (VIC) and Project EnergyConnect at Dinawan power station
Financial close
pre-FID
Construction start
unknown
Operations start
November 2030 (TCV guidance, revised June 2025)
Location
LGA
Multiple — NSW Riverina
Region
Southern NSW / Riverina
REZ
—
REZ relationship
connecting to REZ network
Coordinates
-35.1, 145.2 (approximate)
Project documents — EIS, SEARs, proponent pages
Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.
- planning portal pageConfidence: Very highVictoria to NSW Interconnector West — NSW Planning Portalhttps://www.planningportal.nsw.gov.au/major-projects/projects/victoria-nsw-interconnector-west ↗EIS lodged; Submissions and Amendment Reports due mid-2026.
- proponent pageConfidence: Very highVNI West — Transgrid project pagehttps://www.transgrid.com.au/projects-innovation/vni-west/ ↗Project overview.
- otherConfidence: HighVNI West project websitehttps://vniwproject.com.au/ ↗Dedicated project site (TCV).
Notes
AEMO ISP-actionable. 235 km of 500 kV double circuit in NSW connecting to PEC at Dinawan substation. Joint NSW/VIC delivery (Transgrid + Transmission Company Victoria). Connects directly to the SW REZ network — relevant to SW REZ project deliverability.
Source confidence: 85/100
Last verified: 2026-05-13
Every material fact on this page is sourced. A "View source" link is provided per source below.
Last verified: 2026-05-13
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: Very high- primaryNSW Planning Portal — Major ProjectsView source ↗Authoritative for NSW SSD and SSI planning status. Hosts each project's Environmental Impact Statement (EIS), SEARs, response to submissions, and other planning documents. Outranks proponent and media reports for planning_status. Per-project EIS and SSD page URLs are tracked under each project's project_documents.
- primaryAEMO — Integrated System PlanView source ↗Sets transmission and renewable investment direction. Informs REZ planning but does not approve individual projects.
- secondaryProponent project websitesView source ↗Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
- Planning status against the NSW Planning Portal — verify SSD reference.
- EPBC referral status — verify against DCCEEW public notices.
- Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
- Workforce and accommodation commitments — confirm in SSD documentation or VPA.
- First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context
LGA detail
— NSW Riverina
1 projects · everything affecting this council area
Regional spend
Annual flow by year
This project's share of the year-by-year capex flow into regional NSW
Project timeline
Gantt by REZ
Visual overlap with neighbouring projects' construction windows
Cross-sector pressures
Non-REZ competing demand
What else is being built in the region in the same window
Upcoming decisions
1 relevant to this project or REZ
IPC meetings, EIS exhibitions, council determinations