Tallawarra B Power Station
EnergyAustralia
otheroperatingConfidence: Very high
Capacity and technology
Technology
other
Capacity (MW)
316 MW
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capex benchmark not configured for technology: other.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
operating
Planning status
Approved and constructed; commercial operations from August 2023
Access right status
pre-REZ access scheme
EPBC status
approved
Grid connection
connected — Dapto substation
Financial close
complete
Construction start
2021
Operations start
2023
Location
LGA
Wollongong / Shellharbour
Region
Illawarra coastal NSW — Lake Illawarra, adjacent to Tallawarra A
REZ
Illawarra REZ
REZ relationship
inside declared REZ
Coordinates
-34.55, 150.8 (approximate)
Project documents — EIS, SEARs, proponent pages
Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.
- proponent pageConfidence: Very highPublished: 2023Tallawarra Power Station — EnergyAustraliahttps://www.energyaustralia.com.au/about-us/energy-generation/tallawarra-power-station ↗316 MW dual-fuel (natural gas + hydrogen) open-cycle gas turbine. First Australian power station designed to use green hydrogen as part of its fuel mix. Operational since Aug 2023. Adjacent to Tallawarra A (435 MW CCGT).
Notes
Gas peaker, not a renewable generation project — but tracked because Tallawarra B is the first Australian power station designed to use green hydrogen as part of its fuel mix and sits squarely inside the declared Illawarra REZ. Relevant to the Illawarra REZ's green-hydrogen / industrial-decarbonisation narrative. Technology classified as 'other' (gas/H2 hybrid) rather than as wind/solar/BESS.
Source confidence: 85/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: Very high- secondaryProponent project websitesView source ↗Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
- primaryAEMO — Generation InformationView source ↗Technical pipeline data for NEM connections. Authoritative for grid-connection technical status.
Open questions
- Planning status against the NSW Planning Portal — verify SSD reference.
- EPBC referral status — verify against DCCEEW public notices.
- Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
- Workforce and accommodation commitments — confirm in SSD documentation or VPA.
- First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context
REZ workspace
Illawarra REZ
All projects, pressure bands and shared-value commitments for this REZ
LGA detail
Wollongong
3 projects · everything affecting this council area
LGA detail
Shellharbour
3 projects · everything affecting this council area
Workforce + supply ratio
Demand vs ABS baseline
How this REZ's peak compares to existing regional workforce
Regional spend
Annual flow by year
This project's share of the year-by-year capex flow into regional NSW
Project timeline
Gantt by REZ
Visual overlap with neighbouring projects' construction windows
Cross-sector pressures
Non-REZ competing demand
What else is being built in the region in the same window