Projects in or touching the Wollongong Local Government Area. Where a project spans multiple LGAs it appears on each of their pages.
3
Total projects tracked
1.32 GW
Capacity tracked
1
Operating / UC / approved
1
In planning / candidate
Status breakdown
- Operating / under construction: 1
- Approved / access rights: 0
- In planning (EIS / assessment): 0
- Scoping / investigation / early: 1
Projects in this LGA, by REZ
Illawarra REZ(3 projects)Open REZ workspace →
| Project | Proponent | Tech | Capacity | Status | Confidence |
|---|---|---|---|---|---|
| Illawarra REZ Network Infrastructure | EnergyCo NSW | transmission | 1.00 GW | investigation area | Confidence: High |
| Illawarra Offshore Wind Zone (paused) | BlueFloat Energy (application withdrawn Q1 2026) | offshore wind | unknown | withdrawn | Confidence: High |
| Tallawarra B Power Station | EnergyAustralia | other | 316 MW | operating | Confidence: Very high |