Demo seed only: this NSW deep dive is built exclusively using publicly accessible information (refer to the Sources tab). Lecroma tracks ~21 REZ-equivalents nationallyacross NSW, VIC, QLD, SA and Commonwealth offshore in client work. When the information feeds from our client and non-public data are cut off, the model quickly becomes lobotomised and less accurate. To us, the message is clear: there's plenty of data both now and emerging — access and trust is the key barrier. The frameworks and ideas Lecroma have proposed seek to address this in a targeted and pragmatic way — minimum viable functionality should be the short-term goal so we can build on it across our regions.
Data currency: 2026-05-25 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep dive › Illawarra REZ › Illawarra Offshore Wind Zone (paused)

Illawarra Offshore Wind Zone (paused)

BlueFloat Energy (application withdrawn Q1 2026)
offshore windwithdrawnConfidence: High
Capacity and technology
Technology
offshore wind
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
withdrawn
Planning status
Federal Illawarra offshore wind area declared under OEI Act 2021; feasibility licence application from BlueFloat Energy withdrawn Q1 2026; Australian government will not grant feasibility licences in Illawarra. Zone open for R&D licences only.
Access right status
n/a — federal offshore licensing pathway, application withdrawn
EPBC status
n/a — application withdrawn before EPBC
Grid connection
n/a — no project to connect
Financial close
n/a — withdrawn
Construction start
n/a
Operations start
n/a
Location
LGA
Wollongong / Shellharbour / Kiama (host coastal LGAs)
Region
Illawarra coastal NSW — federal offshore declared area
REZ
Illawarra REZ
REZ relationship
adjacent — offshore declared area off Illawarra coast
Coordinates
-34.5, 151.1 (approximate)
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

Notes

Tracked for completeness — the pause is itself a material data point for the Illawarra REZ narrative. The federal offshore pathway was originally the largest potential generation source for the Illawarra REZ; its absence reframes the state REZ around distributed energy, community batteries and green industry (steel/H2).

Source confidence: 78/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: High
  • primaryDCCEEW — EPBC referrals and approvals
    View source ↗
    Authoritative for EPBC referral and approval status. EPBC approval is separate from state planning approval.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.