Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveIllawarra REZIllawarra Offshore Wind Zone (paused)

Illawarra Offshore Wind Zone (paused)

BlueFloat Energy (application withdrawn Q1 2026)
offshore windwithdrawnConfidence: High
Capacity and technology
Technology
offshore wind
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
withdrawn
Planning status
Federal Illawarra offshore wind area declared under OEI Act 2021; feasibility licence application from BlueFloat Energy withdrawn Q1 2026; Australian government will not grant feasibility licences in Illawarra. Zone open for R&D licences only.
Access right status
n/a — federal offshore licensing pathway, application withdrawn
EPBC status
n/a — application withdrawn before EPBC
Grid connection
n/a — no project to connect
Financial close
n/a — withdrawn
Construction start
n/a
Operations start
n/a
Location
LGA
Wollongong / Shellharbour / Kiama (host coastal LGAs)
Region
Illawarra coastal NSW — federal offshore declared area
REZ
Illawarra REZ
REZ relationship
adjacent — offshore declared area off Illawarra coast
Coordinates
-34.5, 151.1 (approximate)
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

Notes

Tracked for completeness — the pause is itself a material data point for the Illawarra REZ narrative. The federal offshore pathway was originally the largest potential generation source for the Illawarra REZ; its absence reframes the state REZ around distributed energy, community batteries and green industry (steel/H2).

Source confidence: 78/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: High
  • primaryDCCEEW — EPBC referrals and approvals
    View source ↗
    Authoritative for EPBC referral and approval status. EPBC approval is separate from state planning approval.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context