LGA detail
Kiama (host coastal LGAs
Projects in or touching the Kiama (host coastal LGAs Local Government Area. Where a project spans multiple LGAs it appears on each of their pages.
1
Total projects tracked
—
Capacity tracked
0
Operating / UC / approved
0
In planning / candidate
Status breakdown
- Operating / under construction: 0
- Approved / access rights: 0
- In planning (EIS / assessment): 0
- Scoping / investigation / early: 0
Projects in this LGA, by REZ
Illawarra REZ(1 projects)Open REZ workspace →
| Project | Proponent | Tech | Capacity | Status | Confidence |
|---|---|---|---|---|---|
| Illawarra Offshore Wind Zone (paused) | BlueFloat Energy (application withdrawn Q1 2026) | offshore wind | unknown | withdrawn | Confidence: High |
