NSW deep diveSouth West REZDinawan Energy Hub — Wind Farm (POC 1+2)

Dinawan Energy Hub — Wind Farm (POC 1+2)

Spark Renewables
windresponse to submissionsConfidence: Very highCertainty: medium
Capacity and technology
Technology
wind
Capacity (MW)
707 MW
Estimated capex, local spend and peak workforce
Total development cost
~$2.47B benchmark estimate
707 MW × $3.5M/MW (wind, NSW 2025-26 escalated)
Industry benchmark only — not project-specific. Sources: Clean Energy Council, BloombergNEF 2024 Australian utility-scale LCOE inputs, AEMO ISP 2024 cost assumptions. Actual capex varies materially by site, OEM, supply chain and grid-connection works.
Estimated local / regional spend
~$544M benchmark estimate
22% of capex — Clean Energy Council benchmark for renewable energy construction in regional Australia. Actual local content varies by project siting, procurement strategy and any access-scheme local-content conditions.
Estimated peak construction workforce
~495 roles benchmark estimate
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Workforce breakdown — sector mix and phasing

Sector mix and phase distribution for the estimated construction workforce. Basis: industry norm (Clean Energy Council, ARENA, AEMO ISP 2024 + comparable EIS Social Impact Assessments). Numbers are decision-support indicators, not a project-specific forecast.

By service sector / industry (peak year)
Civil / earthworks
~149 FTE
Electrical trades
~89 FTE
Mechanical / structural
~109 FTE
Plant operators
~59 FTE
PM / engineering / env
~50 FTE
Logistics / admin
~40 FTE
By phase (across construction window)
PhaseFTEWhat's happening
Mobilisation + civils (year 1)
~297
Site prep, access roads, foundations, early electrical. Civil trades dominant.
Peak construction (year 2)
~495
All trades concurrent. Turbine / panel delivery, electrical install, commissioning prep.
Commissioning / demob (year 3)
~347
Specialist electrical and testing. Civil and structural ramping down.
Operations (ongoing)
~35
Permanent O&M workforce — typically 5–10% of construction peak. Plus periodic major-maintenance windows.

Sector mix from CEC, ARENA and AEMO ISP workforce profiles for utility-scale Australian builds. Phase distribution from comparable EIS Social Impact Assessments. Indicative only — actual workforce varies with OEM, contractor strategy, weather and OSOM scheduling.

Approvals and access rights
Project status
response to submissions
Planning status
Under IPC assessment; public meeting scheduled Coleambally 27 February 2026
Access right status
awarded — SW REZ access scheme
EPBC status
verify
Grid connection
adjacent to Dinawan substation (PEC Eastern Section operational)
Financial close
subject to planning approval
Construction start
unknown
Operations start
unknown
Location
LGA
Murrumbidgee
Region
Riverina NSW — between Coleambally and Jerilderie
REZ
South West REZ
REZ relationship
inside declared REZ
Coordinates
-34.7, 146 (approximate)
Business certainty
Certainty: mediumScore: 70/100

Three points-of-connection at one hub site offers logistics synergies but concentrates community impact.

Planning risk: moderateGrid risk: lowSocial risk: lowWorkforce: moderateAccommodation: moderateSupply chain: moderateBiodiversity: moderateFirst Nations: moderate
Next decision point: SSD assessment determination
Status timeline
  1. 2026-04-22 · access right awarded
    Access rights confirmed under the SW REZ access scheme — Dinawan Energy Hub POC 1.
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

Notes

POC 1 (357 MW) + POC 2 (350 MW) wind farm consolidated under one Planning Portal SSD. Currently in response-to-submissions phase; IPC public meeting 27 Feb 2026. Wind farm component of the Dinawan Energy Hub access right (1,007 MW total across wind + solar + BESS).

Source confidence: 88/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: Very high
  • primaryNSW Planning Portal — Major Projects
    View source ↗
    Authoritative for NSW SSD and SSI planning status. Hosts each project's Environmental Impact Statement (EIS), SEARs, response to submissions, and other planning documents. Outranks proponent and media reports for planning_status. Per-project EIS and SSD page URLs are tracked under each project's project_documents.
  • primaryEnergyCo NSW
    View source ↗
    Primary authority for NSW Renewable Energy Zones, access schemes, access-right tender outcomes and REZ project coordination under the Electricity Infrastructure Investment Act 2020.
  • primaryAEMO Services / AusEnergy Services
    View source ↗
    Consumer Trustee for NSW LTESA / access-right tenders. Authoritative for access-right award status.
  • secondaryProponent project websites
    View source ↗
    Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.