Lecroma — Shaping a resilient future
Demo seed only: this NSW deep dive is built exclusively using publicly accessible information (refer to the Sources tab). Lecroma tracks ~21 REZ-equivalents nationallyacross NSW, VIC, QLD, SA and Commonwealth offshore in client work. When the information feeds from our client and non-public data are cut off, the model quickly becomes lobotomised and less accurate. To us, the message is clear: there's plenty of data both now and emerging — access and trust is the key barrier. The frameworks and ideas Lecroma have proposed seek to address this in a targeted and pragmatic way — minimum viable functionality should be the short-term goal so we can build on it across our regions.
Data currency: 2026-05-25 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep dive › LGA view › Balranald Shire
LGA detail

Balranald Shire

Projects in or touching the Balranald Shire Local Government Area. Where a project spans multiple LGAs it appears on each of their pages.

3
Total projects tracked
3.10 GW
Capacity tracked
1
Operating / UC / approved
2
In planning / candidate
Status breakdown
  • Operating / under construction: 1
  • Approved / access rights: 0
  • In planning (EIS / assessment): 2
  • Scoping / investigation / early: 0
Projects in this LGA, by REZ
Cross-REZ / no REZ(1 projects)
ProjectProponentTechCapacityStatusConfidence
Limondale Solar FarmInnogy Renewables Australia (developer); Engie (current operator)solar349 MWoperatingConfidence: Very high
South West REZ(2 projects)Open REZ workspace →
ProjectProponentTechCapacityStatusConfidence
Junction Rivers Wind FarmWindlab (Tattarang / Andrew Forrest, via Squadron Energy)wind750 MWEIS preparationConfidence: High
Koorakee Energy ParkSquadron Energyhybrid2.00 GWEIS preparationConfidence: High