Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveLGA viewBalranald Shire
LGA detail

Balranald Shire

Projects in or touching the Balranald Shire Local Government Area. Where a project spans multiple LGAs it appears on each of their pages.

3
Total projects tracked
3.10 GW
Capacity tracked
1
Operating / UC / approved
2
In planning / candidate
Status breakdown
  • Operating / under construction: 1
  • Approved / access rights: 0
  • In planning (EIS / assessment): 2
  • Scoping / investigation / early: 0
Projects in this LGA, by REZ
Cross-REZ / no REZ(1 projects)
ProjectProponentTechCapacityStatusConfidence
Limondale Solar FarmInnogy Renewables Australia (developer); Engie (current operator)solar349 MWoperatingConfidence: Very high
South West REZ(2 projects)Open REZ workspace →
ProjectProponentTechCapacityStatusConfidence
Junction Rivers Wind FarmWindlab (Tattarang / Andrew Forrest, via Squadron Energy)wind750 MWEIS preparationConfidence: High
Koorakee Energy ParkSquadron Energyhybrid2.00 GWEIS preparationConfidence: High