Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveLGA viewHay Shire
LGA detail

Hay Shire

Projects in or touching the Hay Shire Local Government Area. Where a project spans multiple LGAs it appears on each of their pages.

2
Total projects tracked
2.76 GW
Capacity tracked
0
Operating / UC / approved
2
In planning / candidate
Status breakdown
  • Operating / under construction: 0
  • Approved / access rights: 0
  • In planning (EIS / assessment): 2
  • Scoping / investigation / early: 0
Projects in this LGA, by REZ
South West REZ(2 projects)Open REZ workspace →
ProjectProponentTechCapacityStatusConfidence
Bullawah Wind FarmBayWa r.e.wind262.3 MWEIS preparationConfidence: High
Abercrombie Wind FarmVestas (Abercrombie Windfarm Pty Ltd)wind2.50 GWEIS preparationConfidence: High