Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveSouth West REZBerrigan Wind Farm (withdrawn)

Berrigan Wind Farm (withdrawn)

Windlab (Tattarang / Andrew Forrest)
windwithdrawnConfidence: Medium
Capacity and technology
Technology
wind
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
withdrawn
Planning status
Withdrawn by proponent — Windlab determined project did not offer required value return
Access right status
not awarded — withdrawn before access scheme tender
EPBC status
n/a — project withdrawn
Grid connection
n/a — project withdrawn
Financial close
withdrawn pre-FID
Construction start
n/a
Operations start
n/a
Location
LGA
Berrigan
Region
Riverina NSW
REZ
South West REZ
REZ relationship
inside declared REZ
Coordinates
-35.66, 145.82 (approximate)
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

Notes

Included to document the SW REZ project pipeline honestly — proposals that go forward, proposals that don't. ~26 turbines originally proposed between Berrigan and Barooga. Windlab (Tattarang-backed) withdrew citing investment return. Example of a candidate project not proceeding for commercial reasons before any planning determination.

Source confidence: 65/100
Last verified: 2026-05-13
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: Medium
  • secondaryProponent project websites
    View source ↗
    Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
  • supportingMedia reporting (context only)
    View source ↗
    Media is used for context, controversy, timing signals and public scrutiny — never as the source of truth for regulatory status.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context