Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveLGA viewArmidale Regional
LGA detail

Armidale Regional

Projects in or touching the Armidale Regional Local Government Area. Where a project spans multiple LGAs it appears on each of their pages.

3
Total projects tracked
1.85 GW
Capacity tracked
0
Operating / UC / approved
2
In planning / candidate
Status breakdown
  • Operating / under construction: 0
  • Approved / access rights: 0
  • In planning (EIS / assessment): 1
  • Scoping / investigation / early: 1
Projects in this LGA, by REZ
New England REZ(3 projects)Open REZ workspace →
ProjectProponentTechCapacityStatusConfidence
Northern Tablelands Wind FarmOrigin Energywind608 MWscopingConfidence: High
Oven Mountain Pumped Hydro Energy StorageAlinta Energypumped hydro900 MWon exhibitionConfidence: High
Doughboy Wind Farm (withdrawn)unknownwind340 MWwithdrawnConfidence: High