Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveCentral-West Orana REZOrana Wind Farm (discontinued)

Orana Wind Farm (discontinued)

ACCIONA Energía
windwithdrawnConfidence: High
Capacity and technology
Technology
wind
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
withdrawn
Planning status
Discontinued December 2025 — proponent withdrew development
Access right status
not awarded
EPBC status
n/a — discontinued
Grid connection
n/a
Financial close
n/a
Construction start
n/a
Operations start
n/a
Location
LGA
Warrumbungle Shire / Mid-Western Regional
Region
Central West NSW — south of Dunedoo
REZ
Central-West Orana REZ
REZ relationship
inside declared REZ
Coordinates
-32.05, 149.4 (approximate)
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

  • proponent pageConfidence: HighPublished: 2025-12
    Orana Wind Farm — ACCIONA Energía Community
    https://community.acciona.com.au/orana
    ACCIONA Energía discontinued the Orana Wind Farm development in December 2025. Project was south of Dunedoo, primarily Warrumbungle Shire with some turbines proposed in Mid-Western Regional.
Notes

Withdrawn project — tracked for completeness. ACCIONA's decision to discontinue is itself a notable data point for the CWO REZ delivery-readiness picture (an established global developer withdrawing despite being inside an access-rights-active REZ).

Source confidence: 72/100
Last verified: 2026-05-15
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: High
  • secondaryProponent project websites
    View source ↗
    Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context