Bendemeer Wind Farm
Metis Energy (Athena Wind Energy Australia)
windscopingConfidence: High
Capacity and technology
Technology
wind
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
~$750M media-reported
Stated by media
Northern Daily Leader: scoping report values wind component at ~$750M.
Estimated local / regional spend
~$165M benchmark estimate
22% of capex — Clean Energy Council benchmark for renewable energy construction in regional Australia. Actual local content varies by project siting, procurement strategy and any access-scheme local-content conditions.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
scoping
Planning status
Scoping report submitted; SSD with separate wind and solar assessments. Estimated $750 million capex.
Access right status
not awarded
EPBC status
unknown
Grid connection
unknown
Financial close
not at financial close
Construction start
unknown
Operations start
unknown
Location
LGA
Tamworth Regional
Region
New England NSW
REZ
New England REZ
REZ relationship
inside declared REZ
Coordinates
-30.93, 151.13 (approximate)
Project documents — EIS, SEARs, proponent pages
Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.
- planning portal pageConfidence: Very highBendemeer Wind Farm — NSW Planning Portalhttps://www.planningportal.nsw.gov.au/major-projects/projects/bendemeer-wind-farm ↗Scoping report on public file.
- planning portal pageConfidence: Very highBendemeer Solar Farm — NSW Planning Portalhttps://www.planningportal.nsw.gov.au/major-projects/projects/bendemeer-solar-farm ↗Separate Bendemeer Solar SSD page (sister project).
- proponent pageConfidence: Very highBendemeer Wind Project — Bendemeer Energy Hubhttps://bendemeerenergyhub.com.au/wind-project/ ↗Proponent-operated dedicated hub website.
Notes
Status updated: scoping. Part of Bendemeer Renewable Energy Hub (wind + solar + battery). 9,072 ha project area. ~250 construction jobs / 15 operational. Owned by Singapore-based Metis Energy.
Source confidence: 72/100
Last verified: 2026-05-13
Every material fact on this page is sourced. A "View source" link is provided per source below.
Last verified: 2026-05-13
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: High- primaryNSW Planning Portal — Major ProjectsView source ↗Authoritative for NSW SSD and SSI planning status. Hosts each project's Environmental Impact Statement (EIS), SEARs, response to submissions, and other planning documents. Outranks proponent and media reports for planning_status. Per-project EIS and SSD page URLs are tracked under each project's project_documents.
- secondaryProponent project websitesView source ↗Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
- Planning status against the NSW Planning Portal — verify SSD reference.
- EPBC referral status — verify against DCCEEW public notices.
- Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
- Workforce and accommodation commitments — confirm in SSD documentation or VPA.
- First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context
REZ workspace
New England REZ
All projects, pressure bands and shared-value commitments for this REZ
LGA detail
Tamworth Regional
7 projects · everything affecting this council area
Workforce + supply ratio
Demand vs ABS baseline
How this REZ's peak compares to existing regional workforce
Regional spend
Annual flow by year
This project's share of the year-by-year capex flow into regional NSW
Project timeline
Gantt by REZ
Visual overlap with neighbouring projects' construction windows
Cross-sector pressures
Non-REZ competing demand
What else is being built in the region in the same window
Upcoming decisions
4 relevant to this project or REZ
IPC meetings, EIS exhibitions, council determinations