Dungowan Pumped Hydro Energy Storage Project
Sector mix and phase distribution for the estimated construction workforce. Basis: industry norm (Clean Energy Council, ARENA, AEMO ISP 2024 + comparable EIS Social Impact Assessments). Numbers are decision-support indicators, not a project-specific forecast.
| Phase | FTE | What's happening |
|---|---|---|
| Mobilisation + civils (year 1) | ~270 | Site prep, access roads, foundations, early electrical. Civil trades dominant. |
| Peak construction (year 2) | ~450 | All trades concurrent. Turbine / panel delivery, electrical install, commissioning prep. |
| Commissioning / demob (year 3) | ~315 | Specialist electrical and testing. Civil and structural ramping down. |
| Operations (ongoing) | ~32 | Permanent O&M workforce — typically 5–10% of construction peak. Plus periodic major-maintenance windows. |
Sector mix from CEC, ARENA and AEMO ISP workforce profiles for utility-scale Australian builds. Phase distribution from comparable EIS Social Impact Assessments. Indicative only — actual workforce varies with OEM, contractor strategy, weather and OSOM scheduling.
Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.
- proponent pageConfidence: Very highDungowan Pumped Hydro Energy Storage Project — EDF Australia (project site)https://www.dungowanpumpedhydro.com.au/ ↗Project-specific website. 300 MW × 10 hours = 3,000 MWh storage. Dungowan Valley 45 km SW of Tamworth.
Status updated: early proposal — DA lodged Tamworth Regional Council for investigation works. Full project not yet at SSD stage. Note that Dungowan Creek Alliance is a community opposition group operating publicly.
Last verified: 2026-05-13
Every material fact on this page is sourced. A "View source" link is provided per source below.
- secondaryProponent project websitesView source ↗Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
- secondaryCouncil minutes — CWO REZ LGAsView source ↗Council minutes, agendas, planning decisions affecting REZ delivery.
- supportingMedia reporting (context only)View source ↗Media is used for context, controversy, timing signals and public scrutiny — never as the source of truth for regulatory status.
- Planning status against the NSW Planning Portal — verify SSD reference.
- EPBC referral status — verify against DCCEEW public notices.
- Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
- Workforce and accommodation commitments — confirm in SSD documentation or VPA.
- First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
