Yarrowyck Wind Farm

EDF Renewables Australia
windearly proposalConfidence: MediumCertainty: low
Capacity and technology
Technology
wind
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
early proposal
Planning status
Renewable Energy Infrastructure Licence (REIL) application submitted under H&RE Act 2023
Access right status
not awarded
EPBC status
unknown
Grid connection
unknown
Financial close
not at financial close
Construction start
unknown
Operations start
unknown
Location
LGA
Uralla Shire
Region
Northern Tablelands NSW
REZ
New England REZ
REZ relationship
inside declared REZ
Coordinates
-30.52, 151.4 (approximate)
Business certainty
Certainty: lowScore: 30/100

Indicative scoring for investigation-area projects in the New England REZ. Path to delivery requires SEARs → EIS → assessment → access rights (or alternative connection commercial structure).

Planning risk: highGrid risk: highSocial risk: moderateWorkforce: unknownAccommodation: unknownSupply chain: unknownBiodiversity: moderateFirst Nations: moderate
Next decision point: SEARs response / EIS preparation start
Status timeline
  1. 2026-04-28 · media update
    Regional media reporting on landholder engagement and community information sessions. Context only.
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

Notes

REIL application path under H&RE Act 2023 rather than traditional SSD route. Gomeroi and Anaiwan Country.

Source confidence: 55/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: Medium
  • secondaryProponent project websites
    View source ↗
    Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.