Hillview Solar Farm
ACE Power (TagEnergy)
solarscopingConfidence: Medium
Capacity and technology
Technology
solar
Capacity (MW)
unknown
Estimated capex, local spend and peak workforce
Total development cost
unknown unknown
Capacity unknown — capex cannot be benchmark-estimated.
Estimated local / regional spend
unknown unknown
Local spend not estimable without a capex figure.
Estimated peak construction workforce
unknown
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Approvals and access rights
Project status
scoping
Planning status
Part of Hillview Energy Hub; scoping
Access right status
not awarded
EPBC status
unknown
Grid connection
unknown
Financial close
not at financial close
Construction start
unknown
Operations start
unknown
Location
LGA
Uralla Shire / Tamworth Regional
Region
New England NSW
REZ
New England REZ
REZ relationship
inside declared REZ
Coordinates
-30.71, 151.57 (approximate)
Project documents — EIS, SEARs, proponent pages
Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.
- proponent pageConfidence: HighHillview Energy Hub — ACE Powerhttps://acepower.com.au/hillview/ ↗Solar component of three-part hub.
Notes
Solar farm sized within the Hillview Energy Hub; specific MW not yet public.
Source confidence: 60/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: Medium- secondaryProponent project websitesView source ↗Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
- Planning status against the NSW Planning Portal — verify SSD reference.
- EPBC referral status — verify against DCCEEW public notices.
- Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
- Workforce and accommodation commitments — confirm in SSD documentation or VPA.
- First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context
REZ workspace
New England REZ
All projects, pressure bands and shared-value commitments for this REZ
LGA detail
Uralla Shire
11 projects · everything affecting this council area
LGA detail
Tamworth Regional
7 projects · everything affecting this council area
Workforce + supply ratio
Demand vs ABS baseline
How this REZ's peak compares to existing regional workforce
Regional spend
Annual flow by year
This project's share of the year-by-year capex flow into regional NSW
Project timeline
Gantt by REZ
Visual overlap with neighbouring projects' construction windows
Cross-sector pressures
Non-REZ competing demand
What else is being built in the region in the same window
Upcoming decisions
4 relevant to this project or REZ
IPC meetings, EIS exhibitions, council determinations