Lecroma — Shaping a resilient future
Demo seed — verify before use. This dashboard distinguishes between declared REZs, proposed or candidate REZs, access-rights projects, planning-portal projects, priority-list projects and offshore wind declared areas. Status does not imply final approval unless confirmed by the relevant authority.
Data currency: 2026-05-18 · 59 of 67 projects verified at confidence ≥ 70/100
Verified URLs span NSW Planning Portal, IPC, DCCEEW EPBC, proponent project sites.
NSW deep diveNew England REZHillview Wind Farm

Hillview Wind Farm

ACE Power (acquired by TagEnergy mid-2025)
windscopingConfidence: High
Capacity and technology
Technology
wind
Capacity (MW)
250 MW
Estimated capex, local spend and peak workforce
Total development cost
~$370M proponent-stated
Stated by proponent
ACE Power: $370M wind component of Hillview Energy Hub.
Estimated local / regional spend
~$81M benchmark estimate
22% of capex — Clean Energy Council benchmark for renewable energy construction in regional Australia. Actual local content varies by project siting, procurement strategy and any access-scheme local-content conditions.
Estimated peak construction workforce
~175 roles benchmark estimate
Industry benchmark: ~0.7 FTE/MW wind, 0.5 FTE/MW solar, 0.4 FTE/MWh BESS, 1.5 FTE/MW pumped hydro. Peak during civil/electrical phase only — operations workforce is typically ~5-10% of construction peak.
Workforce breakdown — sector mix and phasing

Sector mix and phase distribution for the estimated construction workforce. Basis: industry norm (Clean Energy Council, ARENA, AEMO ISP 2024 + comparable EIS Social Impact Assessments). Numbers are decision-support indicators, not a project-specific forecast.

By service sector / industry (peak year)
Civil / earthworks
~53 FTE
Electrical trades
~32 FTE
Mechanical / structural
~39 FTE
Plant operators
~21 FTE
PM / engineering / env
~18 FTE
Logistics / admin
~14 FTE
By phase (across construction window)
PhaseFTEWhat's happening
Mobilisation + civils (year 1)
~105
Site prep, access roads, foundations, early electrical. Civil trades dominant.
Peak construction (year 2)
~175
All trades concurrent. Turbine / panel delivery, electrical install, commissioning prep.
Commissioning / demob (year 3)
~122
Specialist electrical and testing. Civil and structural ramping down.
Operations (ongoing)
~12
Permanent O&M workforce — typically 5–10% of construction peak. Plus periodic major-maintenance windows.

Sector mix from CEC, ARENA and AEMO ISP workforce profiles for utility-scale Australian builds. Phase distribution from comparable EIS Social Impact Assessments. Indicative only — actual workforce varies with OEM, contractor strategy, weather and OSOM scheduling.

Approvals and access rights
Project status
scoping
Planning status
Scoping report submitted to DPHI November 2024
Access right status
not awarded
EPBC status
unknown
Grid connection
unknown
Financial close
not at financial close
Construction start
unknown
Operations start
~2031 (proponent guidance)
Location
LGA
Uralla Shire / Tamworth Regional
Region
New England NSW
REZ
New England REZ
REZ relationship
inside declared REZ
Coordinates
-30.71, 151.57 (approximate)
Project documents — EIS, SEARs, proponent pages

Direct links to public documents and pages for this project. Phase 2 ingestion will pull updates automatically; Sprint 0 entries are verified manually with a confidence score per record.

Notes

Status updated from investigation-area to scoping. 200-300 MW wind component; $370M; up to 55 turbines. Owner changed from ACE Power to TagEnergy mid-2025.

Source confidence: 75/100
Last verified: 2026-05-18
Every material fact on this page is sourced. A "View source" link is provided per source below.
Source evidence
Confidence: High
  • primaryNSW Planning Portal — Major Projects
    View source ↗
    Authoritative for NSW SSD and SSI planning status. Hosts each project's Environmental Impact Statement (EIS), SEARs, response to submissions, and other planning documents. Outranks proponent and media reports for planning_status. Per-project EIS and SSD page URLs are tracked under each project's project_documents.
  • secondaryProponent project websites
    View source ↗
    Proponent-supplied content from each project's dedicated page on the proponent's website. Useful for technology, capacity intent, community engagement messaging, project newsletters, fact sheets and timeline updates. Cannot override official planning_status or epbc_status. Per-project page URLs are tracked under each project's project_documents.
Open questions
  • Planning status against the NSW Planning Portal — verify SSD reference.
  • EPBC referral status — verify against DCCEEW public notices.
  • Storage MWh and voltage figures — confirm from proponent documents and AEMO Generation Information.
  • Workforce and accommodation commitments — confirm in SSD documentation or VPA.
  • First Nations engagement reporting — confirm in IEP / cultural heritage chapter.
See this project in context